Construction
Site : North
semi-circle of Outer Ring Motorway
¡¡ Total Investment :
120million dollar
¡¡ Funding
Scheme : Self-financing and loan
¡¡
¡¡ Category
of Trade : Infrastructure
¡¡ Progress
Status of the Project : The project has
been taken as an item, and is now preparing for the approval.
¡¡Planned
time for going to Operation :
: the year of 2001
¡¡
¡¡ Project
Profile:
¡¡
The trunk natural gas
pipeline in north semi-ring of Outer Ring starts at the
cross point of the Outer Ring and Jieyuanxi Road. It runs
northward and passes through the South Canal, Jinpu Railway,
Ziya River, the North Canal, Jingjin Highway, Tiedong Road,
New yibai Road, Jinzhonghe Street, Weiguo Road. The pipeline
is linked to the current DN500 high-pressure natural gas
pipeline in Outer Ring by means of the Jindong Storing and
Distribution Station. After the completion of the project,
the high-pressure pipeline in Outer Ring will be encircled.
¡¡
¡¡ Construction Scale and Content:
¡¡
39 km high-pressure gas pipeline will be built with DN700
in diameter and 1.6 mpa in pressure.
¡¡ Social
and Economic Benefit:
¡¡
This project will help
form a high-pressure ring network gas supply system and
thus improve the capability and safety of gas distribution.
¡¡
¡¡ Construction Unit
: Tianjin Gas Group
¡¡ Person in Contact
: Wang Jilai
¡¡ Telephone for Connection
: 23348515
|