|
¡¡
Construction
Site : Tanggu
Xingang, Tianjin
¡¡ Total Investment :
283million dollar
¡¡ Funding
Scheme : Introducing investments
¡¡
¡¡ Category
of Trade : Infrastructure
¡¡ Progress
Status of the Project : The project has
been taken as an item, and is now preparing for the approval
¡¡Planned
time for going to Operation :
The year of 2003
¡¡
¡¡ Project
Profile:
¡¡
A ship lock of 10,000-ton
level is planned to construct on the south of the present
ship lock in order to speed up the growth of inland port
areas of Haihe River, develop port areas of Haihe River
and enhance the connection of the port with the sea. The
new lock is parallel to the old one with the distance of
120 meters between the central lines of the two locks. The
lock is 225 meters in length, 28 meters in width and -9
meters in elevation. It is available to pass one 10,000-ton
ship and one tugboat, or one 5000-ton ship and one 2000-ton
ship, or two 3000-ton combined ships.
¡¡
¡¡ Construction Scale and Content:
¡¡
A 10,000-ton ship lock will be built.
¡¡ Social
and Economic Benefit:
¡¡
¡¡
¡¡ Construction Unit
: Tianjin Port Office
¡¡ Person in Contact
: Shao Binghua
¡¡ Telephone for Connection
: 25705053
|