Construction
Site : New
Harbour Tanggu Tianjin
¡¡ Total Investment :
180.45million dollar
¡¡ Funding
Scheme : Own capital
¡¡
¡¡ Category
of Trade : Infrastructure
¡¡ Progress
Status of the Project : under approval
of feasibility study
¡¡Planned
time for going to Operation :
The year of 2001
¡¡
¡¡ Project
Profile:
¡¡
In line with the general
layout plan on Tianjin Port, Beida Breakwater is on the
elevation of -1m and 3000 meters off the shore. Axis of
the Breakwater runs parallel with the shoreline of the North
Port pond. The Breakwater links to the northern guiding
dike (under planning) in south end and reaches the canal
entrance of Ji Canal in north end. The project involves
the construction of 10km long breakwater and will be executed
in stages according to the development and construction
of Tianjin Port. The first stage project is the most needed
for the development of Beijiang Port area and the construction
of five berths in the North Port pond. In the first stage,
the breakwater of 5482 m in length with semi-circle structure
will be built.
¡¡
¡¡ Construction Scale and Content:
¡¡
The construction of Beida Breakwater with 5482 m long.
¡¡ Social
and Economic Benefit:
¡¡
¡¡
¡¡ Construction Unit
: Tianjin Harbour Bureau
¡¡ Person in Contact
: Shao Binghua
¡¡ Telephone for Connection
: 25705053
|