Construction
Site : New
Habour Tanggu Tianjin
¡¡ Total Investment :
198million dollar
¡¡ Funding
Scheme : Own capital
¡¡
¡¡ Category
of Trade : Infrastructure
¡¡ Progress
Status of the Project : The project has
been approved and is undergoing the study.
¡¡Planned
time for going to Operation :
Aug. 2001
¡¡
¡¡ Project
Profile:
¡¡
In order to adapt to
the traffic of 100,000-ton bulk goods freighter and the
fifth generation container vessels, the waterway will be
continuously widened and deepened on the basis of the first
stage construction. After trimming and dredging, the waterway
will be fit for bulk freighters under 40000-ton levels and
container vessels under 25000-ton level. Moreover, oil tanks
under 20000-ton can pass in two-way during tide period;
ordinary ships under 50000-ton level can pass during tide-free
period; fully loaded container vessels of fifth and sixth
generation can pass the port when the water level is slightly
higher than the average low tide position; ordinary vessels
between 100,000-ton and 150,000-ton level can pass the port
under certain conditions.
¡¡
¡¡ Construction Scale and Content:
¡¡
The total length is 33 km with the floor width of 210m and
the depth of -14.8m. Actual length of waterway construction
is 28km.
¡¡ Social
and Economic Benefit:
¡¡
¡¡
¡¡ Construction Unit
: Tianjin Harbour Bureau
¡¡ Person in Contact
: Shao Binghua
¡¡ Telephone for Connection
: 25705053
|