Construction
Site :New
Habour, Tanggu, Tianjin
¡¡ Total Investment :
1694million dollar
¡¡ Funding
Scheme : Own capital,foreign investment
¡¡
¡¡ Category
of Trade : Infrastructure
¡¡ Progress
Status of the Project : The project has
been taken as an item, and is now preparing for the approval.
¡¡Planned
time for going to Operation :
The year of 2001
¡¡
¡¡ Project
Profile:
¡¡
According to the requirement
of structure adjustment in Tianjin Port and the development
of container transport, Six miscellaneous cargos berths
in the north of Dongtudi will be renovated into four container
berths. After the reconstruction, the all-weather container
berths can accommodate container vessels of fourth generation
and container vessels of fifth generation under some conditions.
The new berth is also available for the branch line ship
under 1500TEU. The elevation of frontier dock is+ 5.85 m,
and the designing bottom elevation of frontier dock is -15.2
m. The berths are equipped with container loading &
unloading bridges and stockyards are equipped with container
stacker.
¡¡
¡¡ Construction Scale and Content:
¡¡
The renovation of six old berths into four container berths
with 1202m in the length of coastline and 150TEU of annual
handling capacity.
¡¡ Social
and Economic Benefit:
¡¡
¡¡
¡¡ Construction Unit
: Tianjin Harbour Bureau
¡¡ Person in Contact
: Shao Binghua
¡¡ Telephone for Connection
: 25705053
|