Construction
Site : New
Habour Tanggu Tianjin
¡¡ Total Investment :
2000million dollar
¡¡ Funding
Scheme : Own capital
¡¡
¡¡ Category
of Trade : Infrastructure
¡¡ Progress
Status of the Project : The project has
gone into operation.
¡¡Planned
time for going to Operation :
The year of 2001
¡¡
¡¡ Project
Profile:
¡¡
According to the requirement
of structure adjustment in the Port and the implement of
the "bulk cargos at the north and carriers at the south"
strategy, the original small-size miscellaneous cargos dock
(about 10-20 docks) will be renovated into carrier berths
and special berths in the North Port of Tianjin Port. The
renovation will be carried out in stages and turns. The
dock will be equipped with small-model container loading
& unloading bridge and the container stacker will be
used in the stockyard.
¡¡
¡¡ Construction Scale and Content:
¡¡
Some berths for miscellaneous cargos will be renovated into
10-12 container berths of 20000-ton level and 30000-ton
level
¡¡ Social
and Economic Benefit:
¡¡
The internal rate of
return is 10.04%. The period of recovery is 15.4 years.
¡¡
¡¡ Construction Unit
: Tianjin Harbour Bureau
¡¡ Person in Contact
: Shao Binghua
¡¡ Telephone for Connection
: 25705053
|