ÖÐ ÎÄ °æ


·± Ìå °æ
 
¡¡¡¡¡¡¡¡¡¡¡¡ £üHome£üTianjin Outlook£üStatistics £üLaw and Policy£üTrade Guide £üInvestment Center £üData Search£ü
¡¡¡¡ home>Data Search>Investment Projest >Content
 
 
 
 
 


Name of Project : Nanjiang Coal Dock in Tianijin Port

¡¡ Construction Site : Nanjiang Dock Area, Tianjin Harbour

¡¡ Total Investment : 2150million dollar

¡¡ Funding Scheme : Selling share of 40% (around 0.742 billion Yuan)
¡¡
¡¡ Category of Trade : Infrastructure

¡¡ Progress Status of the Project : The project has gone into operation.

¡¡Planned time for going to Operation : The year of 1998
¡¡
¡¡ Project Profile:
¡¡ The Nanjiang Coal Dock project in Tianijin Port was approved by the State and was put into construction in 1998. In the year of 2000 the coal dock was reconstructed (including paving, grading, patching and etc.) to increase its designed access capability from 10 million tons to 20 million tons of coal. The reconstruction aims to eliminate pollution resulting from loading & unloading of coal, better the environment and accomplish the Port adjustment of "the coal moving from the north to the south and separation of the dark dock and the white dock". The dock is equipped with two movable loaders, stockyard, piling machine and horizon transport system of the belt conveyor. In addition, two C-model double-vehicle turners are also installed on backside.
¡¡

¡¡ Construction Scale and Content:
¡¡ The construction of Nanjiang Coal Dock includes two 50000-ton coal berths with the annual handling capacity of 20 million tons coal. The dock is mainly used for the export of coal and coke.


¡¡ Social and Economic Benefit:
¡¡ The internal rate of return is 10.04%. The period of recovery is 15.4 years.
¡¡

¡¡ Construction Unit : Tianjin Harbour Bureau
¡¡ Person in Contact : SShao Binghua
¡¡ Telephone for Connection : 25705053

Copyright (C) 2000 Goldentianjin.net.cn, Tianjin Foreign Investment Office All rights reserved