|
¡¡
Construction
Site : Tanggu
District, Jinnan District, Xiqing District, Dagang District,
Jinghai County
¡¡ Total Investment :
3000million dollar
¡¡ Funding
Scheme : JJoint venture or co-operation.
Planned funding share is 80% from introducing investment
and 20% from owner.
¡¡ Category
of Trade : Infrastructure
¡¡ Progress
Status of the Project : The project has
gone into operation.
¡¡Planned
time for going to Operation :
mar. 2001
¡¡
¡¡ Project
Profile:
¡¡
Tangshan-Tianjin Expressway
is a major part of the State-level highway trunk lines under
the State Planning. The Expressway starts from Tangshan
Jiedanla Highway in the north and terminates at Tianjin
Jinghai County, linking Beijing-Shanghai Expressway (one
of the State-level highway trunk lines). The completion
of Beijing-Shenyang Expressway and Beijing-Shanghai Expressway
will encourage the construction of this project as soon
as possible.
¡¡
¡¡ Construction Scale and Content:
¡¡
The Tangshan-Tianjin Expressway (south section in Tianjin)
starts from the west of Tanggu District, linking Tangshan-Tianjin
Expressway in the north section in Tianjin. It passes through
Jinnan District, Xiqing District, Dagang District and terminates
at Wangguantun of Jinghai County, linking Beijing-Shanghai
Expressway. The total length is 66 km with the four-lane
expressway standard and the designed speed of 120km/h.
¡¡ Social
and Economic Benefit:
¡¡
The estimated traffic
volume will be 8595 vehicles/d by the year of 2004. The
number will reach 16836/d by 2010 and 38592/d by 2024. The
project will be wholly recovered in 15.2 years.
¡¡
¡¡ Construction Unit
: Tianjin Road Development Corporation
¡¡ Person in Contact
: Yang Ming
¡¡ Telephone for Connection
: 83711001
|