|
¡¡
Construction
Site : Dongli
District
¡¡ Total
Investment : 800million dollar
¡¡ Funding Scheme : Capital
and bank loan
¡¡ Category
of Trade : Industry
¡¡ Progress
Status of the Project : planning stage
¡¡
¡¡Planned
time for going to Operation :
the year of 2002
¡¡
¡¡ Project
Profile:
¡¡The company worked out plans during the Tenth Five-Year
Plan period. Since the renovation of steel making and casting,
the annual yield of the tube billet can reach 0.9-1 million
tons. Since the renovation of hot-rolling tube unit, the
annual yield of steel tube can reach 650,000 tons. There
is still 300,000-ton margin for the production of tube billets.
It is imperative to carry out the second stage construction
in order to develop Tianjin into the largest production
base of oil supply tubes and high-quality seamless tubes.
¡¡ Construction
Scale and Content:
¡¡ Annual
yield of seamless tube will add 250,000 tons. Construction
content: construction of the second rolling unit of seamless
steel tube with the size of 48-168.3 mm, mainly the production
line of hot-rolling and steel tube finishing, water treatment
and dust removal facilities. 118 sets of equipments are
added, including 20 sets imported ones. The construction
area will increase 50,000 square meters.
¡¡ Social
and Economic Benefit:
¡¡Annual yield can reach 250,000 tons of seamless tubes.
Annual sales income will add 1.11 billion yuan with profit
tax of 275.74 million yuan (profit: 207.32 million yuan;
tax: 68.42 million yuan).
¡¡
¡¡ Construction
Unit : Tianjin Steel Tube Co Ltd
¡¡ Person
in Contact :
Yan Xiaoluo
¡¡ Telephone
for Connection : 24801792
|