Construction
Site : Tianjin
Industry Area on the lower reach of Haihe River
¡¡ Total
Investment : 2240million dollar
¡¡ Funding Scheme : Self-financing
and loan
¡¡ Category
of Trade : Industry
¡¡ Progress
Status of the Project : planning stage
¡¡
¡¡Planned
time for going to Operation :
the year of 2001
¡¡
¡¡ Project
Profile:
¡¡Twice iron & steel smelting technology adopted by Tianjin
Iron & Steel Factory polluted the environment seriously
and should be eliminated. As removing eastwards, Tianjin
Iron & Steel Factory makes great efforts to develop
its production by getting rid of the backward technologies,
lowering the cost and eliminating pollution. This is also
the symbol project of industry moving eastwards
¡¡ Construction
Scale and Content:
¡¡ Two
1000-cubic-meter blast furnaces and two 50-ton rotating
furnaces will be set up. Annual yield of molten iron and
billets will reach 1.3 million tons and 1 million tons respectively
¡¡ Social
and Economic Benefit:
¡¡1.Production cost goes down by eliminating backward technology
of smelting iron and steel. For example, the cost of coke
can reduce 110 million yuan. 2.Providing high-grade raw
materials to metal products, improvement quality of products
and lower the purchase cost to make metalwork industry earn
a extension profit of 50 million yuan. 3.Realization of
the inter-supply of raw materials among Iron & Steel
Co, Tianjin Iron & Steel Factory and No.3 Gas Factory.
Optimizing of the resources setting by means of utilizing
current utilities and auxiliary facilities. .
¡¡
¡¡ Construction
Unit : Tianjin Iron & Steel
Co Ltd
¡¡ Person
in Contact :
Liu Zhe
¡¡ Telephone
for Connection : 23397770
|