|
¡¡
Construction Site
: Huayuan New & Hi-tech Industrial Park
¡¡ Total Investment
: 82.92million dollar
¡¡ Funding Scheme : Self-financing
and loan
¡¡ Category of Trade
: New and Hi-tech
¡¡ Progress Status of the Project
: The project has been approved and is undergoing the study.
¡¡
¡¡Planned
time for going to Operation:
: 2001-5-1
¡¡
¡¡ Project Profile:
¡¡ To upgrade and renovate the original two production lines
of AAA type and 4/5 type and increase a new production line
of AA type. Through the renovation, it will reach the annual
45 million output of Ni-H battery.
¡¡
¡¡ Construction Scale and Content:
¡T 1.Upgrade AAA type from 550 milliamp to 700 milliamp with
the annual yield of 15 million pieces
¡T 2.Uupgrade
4/5A type from 1800 milliamp to 4/3 A type 4000 milliamp
with the annual yield of 15 million pieces.
¡T 3.Upgrade
AA type from 1300 milliamp to 1500 milliamp with the annual
yield of 15million pieces.Total annual yield of Ni-H battery
is 45 million pieces.
¡¡ Social and Economic Benefit:
¡¡Annual sales income is 440 million yuan with the total
profit of 105 million yuan and tax of 30 million yuan
¡¡ Construction Unit
: Tianjin Heping Gulf Electricity Sources Group Co
¡¡ Person in Contact
: Gong Weilin
¡¡ Telephone for Connection :
25248900
|